COMBINED CYCLE POWER PLANTS (ASSEMBLY)
NUON MAGNUM IGCC (1,3 GW)
FABRICOM - EEMSHAVEN - 2011/2013
E&I WPE; Secundary Trays and Conduits Assembly; E&I Cables Installation in CC1,CC2 and CCU3;
Earthing Net System Assembly; Heat Tracing Assembly; HVAC Aystem Assembly; Lighting System
Installation; Fire Fighting System Installation.